VAK Russia 2.1.5 UDC 699.88 CSCSTI 67.00 Russian Classification of Professions by Education 05.00.00 Russian Library and Bibliographic Classification 2 Russian Trade and Bibliographic Classification 6 BISAC TEC UDC 69 Russian Classification of Professions by Education 27.00.00

PROACTIVE MANAGEMENT OF CAPITAL CONSTRUCTION OBJECTS LIFE CYCLE BASED ON HYBRID INTELLIGENT SYSTEMS

Published in Bulletin of Belgorod State Technological University named after. V. G. Shukhov · Volume 11, Issue 6, 2026 · Pages 82–96 · Rubric: Construction and architecture
DOI: https://doi.org/10.34031/2071-7318-2026-11-6-82-96
Received: 29.11.2025 Accepted: 30.01.2026 Published: 10.06.2026 Language of publication: ru-RU
The article discusses the transformation of approaches to managing the life cycle of capital construction objects through the implementation of hybrid intelligent systems. A paradigm shift towards a proactive model based on risk prediction and prevention using hybrid intelligent systems is substantiated. Unlike existing solutions, the proposed approach overcomes the gap between physical models and artificial intelligence methods through their symbiotic integration. An innovative architecture of a hybrid system has been developed, combining physical models of degradation of building structures with modified recurrent neural networks for predicting residual resource based on developed mathematical models. A multi-level implementation architecture is proposed, describing specific computer vision and predictive analytics algorithms, as well as their validation methodology. The study found that the use of hybrid systems will improve the accuracy of predicting building defect development by 35-40% and reduce operating costs by 20-30% through optimization of repair strategies. The proposed approach demonstrates potential for increasing inter-repair periods by 25-40% while ensuring regulatory safety indicators.
proactive management, building life cycle, hybrid intelligent systems, building digital twin, predictive analytics, building structures, machine learning
Funding
Within the framework of the State Assignment, Project No. FZWN‑2025‑0003.
Text References
Text (PDF)
Read Download

1. Ohtilev M.Yu., Ohtilev P.A., Sokolov B.V., Yusupov R.M. Methodological and methodical foundations of proactive management of the life cycle of complex technical objects [Metodologicheskie i metodicheskie osnovy proaktivnogo upravleniya zhiznennym ciklom slozhnyh tekhnicheskih ob"ektov]. Priborostroenie. 2022. No. 11. Pp. 45–52. (rus). DOI:https://doi.org/10.17586/0021-3454-2022-65-11-781-788.

2. Gorbaneva E.P., Preobrazhensky M.A., Bukhtoyarov A.V. Proactive-reactive planning of construction production under conditions of external stochastic influences [Proaktivno-reaktivnoe planirovanie stroitel'nogo proizvodstva v usloviyah vneshnih stohasticheskih vozdejstvij].Akademiya. Arhitektura i stroitel'stvo. 2025. No. 3. Pp. 112–120. (rus). DOI:10/22337/2077-9038-2025-3-153-161

3. Kashiripur M.M., Nikolyuk V.A. Artificial intelligence opportunities in the construction industry [Vozmozhnosti iskusstvennogo intellekta v stroitel'noj industrii]. Vestnik TGASU. 2024. No. 1. Pp. 89–97. (rus). DOI:https://doi.org/10.31675/1607-1859-2024-26-1-163-178.

4. Ergen E., Akinci B., Sacks R. Life-cycle data management of engineered-to-order components using radio frequency identification.Advanced Engineering Informatics. 2007. Vol. 21. No. 4. Pp. 356–366. DOI:https://doi.org/10.1016/j.aei.2006.09.004.

5. Manning R., Messner J.I. Case studies in BIM implementation for programming of healthcare facilities. Electronic Journal of Information Technology in Construction. 2007. Vol. 13. Pp. 446–457.

6. Becerik-Gerber B., Jazizadeh F., Li N., Calis G. Application Areas and Data Requirements for BIM-Enabled Facilities Management. Journal of Construction Engineering and Management. 2012. Vol. 138. No. 3. Pp. 431–442. DOI:https://doi.org/10.1061/(ASCE)CO.1943-7862.0000433.

7. Boldyrev A.A. Digital twins in building life cycle management [Cifrovye dvojniki v upravlenii zhiznennym ciklom zdanij]. Moscow: Stroyizdat Publ., 2023. 215 p. (rus)

8. Wang C., Zhang Y., Li H., Zhou X., Chen Z. Artificial intelligence in civil engineering: A review. Automation in Construction. 2024. Vol. 158. 105298. DOI:https://doi.org/10.1016/j.autcon.2023.105298. DOI:https://doi.org/10.1016/j.autcon.2023.105298.

9. GOST R 71476-2024 (ISO/IEC 22989:2022). Artificial intelligence. Artificial intelligence concepts and terminology. (rus)

10. Suleymanova L.A., Obaidi A.A.Kh. Building life cycle management at the operational stage using artificial neural networks and machine learning models [Upravlenie zhiznennym ciklom zdaniya na etape ekspluatacii s ispol'zovaniem modelej iskusstvennyh nejronnyh setej i mashinnogo obucheniya]. Bulletin of BSTU named after V.G. Shukhov. 2024. No. 3. Pp. 38–46. DOI:https://doi.org/10.34031/2071-7318-2024-9-3-38-46. (rus)

11. Vakhrushev O.A. Life cycle management of capital construction objects: scientific approaches and practical recommendations [Upravlenie zhiznennym ciklom ob"ektov kapital'nogo stroitel'stva: nauchnye podhody i prakticheskie rekomendacii]. Bulletin of the Academy of Knowledge. 2025. No. 4 (69). Pp. 33–41. (rus)

12. Fedosov S.V., Fedoseev V.N., Zaytseva I.A., Voronov V.A. Life cycle management of the sustainable state of a construction object [Upravlenie zhiznennym ciklom ustojchivogo sostoyaniya ob"ekta stroitel'stva]. Expert: theory and practice. 2023. No. 3 (22). Pp. 78–85. (rus). DOI:10.5160826867818_2023_3_131

13. Telichenko V.I., Lapidus A.A., Slesarev M.Yu., Ali M.M. Methods for managing the life cycle of capital construction objects taking into account the influence of environmental and other types of risks [Metody upravleniya zhiznennym ciklom ob"ektov kapital'nogo stroitel'stva s uchetom vliyaniya ekologicheskih i drugih vidov riskov]. Construction: Science and Education. 2024. No. 2. Pp. 15–25. (rus). DOI:https://doi.org/10.22227/2305-5502.2024.2.166-177.

14. Methodology for assessing the penetration of AI in the construction industry [Metodika ocenki proniknoveniya II v stroitel'noj otrasli]. Available at: https://minstroyrf.gov.ru/upload/iblock/382/ 48lh5pqkocexvmukuq 7d03fr0y0ica5r/Metodika_ otsenki_proniknoveniya_II_v_stroitelnoi_otrasli.docx (accessed: 20.11.2025). (rus)

15. Kryukov K.M., Gazal A. Modeling the activities of a construction organization based on artificial intelligence [Modelirovanie deyatel'nosti stroitel'noj organizacii na osnove iskusstvennogo intellekta]. Modern trends in construction, urban planning and territorial planning. 2022. Vol. 1. No. 3. Pp. 16–23. (rus). DOIhttps://doi.org/10.23947/2949-1835-2022-1-1-16-23

16. Bobylev S.N. Energy efficiency: theory and practice [Energoeffektivnost': teoriya i praktika]. Moscow: Moscow State University Publ., 2022. 304 p. (rus)

17. Voronin V.V. Energy-saving technologies in construction [Energosberegayushchie tekhnologii v stroitel'stve]. Moscow: ASV Publ., 2021. 272 p. (rus)

18. Melnik L.G. Optimization of energy consumption of buildings [Optimizaciya energopotrebleniya zdanij]. Saint Petersburg: Piter Publ., 2022. 192 p. (rus)

19. Zhichong Z., Yaowu W. Framework of spatial decision support system for large-scale public building evacuation. In: 2009 WRI Global Congress on Intelligent Systems. Xiamen, China, 2009. Pp. 352–356.

20. GOST R 59278-2020. Product life cycle support. Interactive electronic technical manuals using artificial intelligence and augmented reality technologies. General requirements. (rus)

21. GOST R 71539-2024 (ISO/IEC 5338:2023). Artificial intelligence. Artificial intelligence system life cycle processes. (rus)

22. GOST R 71718-2024. Artificial intelligence technologies in augmented and mixed reality. Indirect visual inspection of geometrical parameters of capital construction objects. General provisions. (rus)

23. GOST R 71484.3-2024 (ISO/IEC 5259-3:2024). Artificial intelligence. Data quality for analytics and machine learning. Part 3. Requirements and recommendations for data quality management. (rus)

24. GOST R 71484.1-2024 (ISO/IEC 5259-1:2024). Artificial intelligence. Data quality for analytics and machine learning. Part 1. Overview, terms and examples. (rus)

25. GOST R 58933-2021. Digital modeling in construction. Requirements for information models of capital construction objects at different stages of the life cycle. (rus)

26. Underwood J., Isikdag U. Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies. New York: Information Science Publishing, 2009. 550 p.

27. Batyrshin I.Z., Nedosekin A.A., Stetsko A.A., Tarasov V.B., Yazennin A.V., Yarushkina N.G. Fuzzy hybrid systems: theory and practice [Nechyotkie gibridnye sistemy: teoriya i praktika]. Ed. N.G. Yarushkina. Moscow: Fizmatlit Publ., 2007. 207 p. (rus)

28. Klachek P.M., Koryagin S.I., Kolesnikov A.V., Minkova E.S. Hybrid adaptive intelligent systems. Part 1: Theory and development technology [Gibridnye adaptivnye intellektual'nye sistemy. CH. 1: Teoriya i tekhnologiya razrabotki]. Kaliningrad: IKBFU Publ., 2011. 374 p. (rus)

29. Kolesnikov A.V., Kirikov I.A., Listopad S.V., Rumovskaya S.B., Domanitskiy A.A. Solving complex traveling salesman problems by methods of functional hybrid intelligent systems [Reshenie slozhnyh zadach kommivoyazhera metodami funkcional'nyh gibridnyh intellektual'nyh sistem]. Ed. A.V. Kolesnikov. Moscow: IPI RAN Publ., 2011. 295 p. (rus)

30. Gavrilov A.V. Hybrid intelligent systems [Gibridnye intellektual'nye sistemy]. Novosibirsk: NSTU Publ., 2003. 168 p. (rus)

31. Yarushkina N.G. Fundamentals of the theory of fuzzy and hybrid systems [Osnovy teorii nechyotkih i gibridnyh sistem]. Moscow: Finansy i statistika Publ., 2004. 320 p. (rus)

32. Kirdyaev M.M. Review of the Python programming language for solving mathematical modeling problems [Obzor yazyka programmirovaniya Python dlya resheniya zadach matematicheskogo modelirovaniya]. Proceedings of the International Symposium "Reliability and Quality". 2016. Vol. 1. Pp. 305–307. (rus)

33. Gantner J., Lenz K., Wittstock B., Sedlbauer K. Sustainable Building Specifier (SBS) in European research projects. Implementing sustainability — barriers and chances. Book of full papers. Sustainable Building Conference (SB). Munich, 2013. Pp. 1245–1254. DOI:https://doi.org/10.22227/2305-5502.2024.2.166-177

34. Fedorov D.Yu. Basics of programming using the Python language as an example [Osnovy programmirovaniya na primere yazyka Python]. Saint Petersburg, 2016. 176 p. (rus)

35. Lutz M. Programming in Python. Volume 1 [Programmirovanie na Python. Tom 1]. Moscow: Simvol Publ., 2016. 992 p. (rus)

36. Summerfield M. Programming in Python 3. A Complete Guide [Programmirovanie na Python 3. Podrobnoe rukovodstvo]. Saint Petersburg: Simvol-Plus Publ., 2009. 608 p. (rus)

37. Bogdanova R.A., Kazazaeva P.I. Primary assessment of statistical data in the STATISTICA program [Pervichnaya ocenka statisticheskih dannyh v programme STATISTICA]. Information and Education: Borders of Communications. 2022. No. 14(22). Pp. 157–162. (rus)

38. Deo T.Y., Sanju A. Data imputation and comparison of custom ensemble models with existing libraries like XGBoost, CATBoost, AdaBoost and Scikit learn for predictive equipment failure. Materials Today: Proceedings. 2023. Vol. 72(3). Pp. 1596–1604. DOI:https://doi.org/10.1016/j.matpr.2022.09.410.

39. Qu C., Houston P.L., Yu Q., Pandey P., Conte R., Nandi A., Bowman J.M. Machine learning software to learn negligible elements of the Hamiltonian matrix. Artificial Intelligence Chemistry. 2023. Vol. 1(2). 100025. DOI:https://doi.org/10.1016/j.aichem.2023.100025.

40. Shen W., Hao Q., Mak H., Neelamkavil J., Xie H., Dickinson J., Thomas R., Pardasani A., Xue H. Systems integration and collaboration in architecture, engineering, construction and facilities management: a review. Advanced Engineering Informatics. 2009. Vol. 24. No. 2. Pp. 196–207.DOI:https://doi.org/10.1016/j.aei.2009.09.001